MND Oil Terminal Samara

 

Technical description

  • Connected to the oil pipeline „Druzhba“ (Transneft) by capacity of 3 mil.tons/year, at distance of 1 km from the terminal
  • Connected to the magistral railway Samara-Moscow, by capacity of 2 mil.tons/year
  • Connected to the magistral highway M5 (Samara-Moscow)
  • Downloading / loading of rail tanks, 32 tanks at one rail line, together 64 tanks at once, lower downloading equipment
  • Storage tanks capacity for crude oil 3×10 000 m3, for light oil products 1× 10 000 m3 and 1×3000 m3
  • Jetty on Volga river for tanker loading by capacity of 2 mil. tons/year, tanker 4 500 dwt (Black sea), 7 000 dwt (Caspian sea), navigation period from april to november
  • Construction finished in 2010

MND in the world

mnd ve světě

Search

 

Latest news RSS

12.04.2012 The 2011 Golden Permon Award for safety in the mining industry has been presented to MND. The Award is bestowed to businesses monitored by the SMA in recognition of outstanding achievements in the area of occupational safety. more